Construction of a modern high-tech storage facility with RGS for Khichateli LTD
In September 2021, Insolar-Kholod completed the construction of the second stage of a modern high-tech storage facility with the Russian Geographical Society for Khichateli LLC (Georgia). The storage capacity for apples increased by 1122 tons, and the total volume now is 2040 tons. The following equipment was used in the design and construction of this […]